Process & Control

 
 
Yard Logs
Logs sourced from all over Malaysia and good partnership with sawmiller to customize the cutting to our sawn sizes needed.

 
 
 
 
 
Incoming timber
Timbers are 100% inspected and properly stacked before proceed to kiln dry.

 
 
 
 
 
Air Dried
Sawn timbers are organizely stacked for air-dried


 
 
 
 
 
 
Kiln Dry
With 8 fully automated kiln dry chambers, material shortage is not an issue to achieve production efficiency and on time delivery.
 
 
 
 
Moisture Content
With well trained QC inspectors to ensure the timbers are well dried before discharge.
 
 
 
 
 
Timber Warehouse
With ample timber storage area that can store up to 6 months supply.

 
 
 
 
 
 
Material Preparation
Five moulder machines provide us the sufficient capacities and capabilities of producing moulding, glazing beads.
 
 
 
 
Computerized Cutting Machine
Highly efficient and high speed cross cutting machine enable efficient material preparing and controlling .
 
 
 
 
Finger Joints
Provide better recovery on timber usage and with the ability to achieve the joint up to 6m length.
 
 
 
 
 
 
Quality Check
With 8 well trained quality inspectors to do online inspection and 100% inspection at quality check point to ensure color uniformity, major defect free before wood are allowed to proceed for next process.
 
 
 
 
 
Rotary Composer
Two 6m long rotary composers provide ample capacities on lamination that allow us to commit delivery time accurately.



 
 
 
 
 
Packaging and Final Inspection
Finished lamscans are fully wrapped to prevent moisture pick up during delivery. All finished product will be randomly selected to perform inspection and final inspcetion report will be recorded.